Location
Santa Monica, CA
Size
1,000 SF
Project Status
Complete: 2022
Construction Value
$130,385
Scope of Work
General Contractor
Project Partners
LOC Architects
About
DD+B partnered with LOC Architects on a major upgrade to the rear paior of the Tenzing building at the Crossroads Chool for Arts & Sciences in Santa Monica, California. With students out on Spring Break, DD+B had a narrow window to complete the project. The existing rear outdoor space was demolished and replaced with a sloped-to-drain elevated concrete patio to provide space for students and faculty to gather for lunch. Additionally, DD+B installed an ADA ramp and stairs to meet existing requirements. All work was completed on time and in budget.
Key Project Details
Completed in record speed, on time and on budget
100% self-performed by DD+B expert craftsmen
Installed ADA ramp and stairs
Demolished existing rear space and replaced it with a sloped to drain elevated concrete patio