loader image
Skip to content

Tenzing Rear Patio Replacement

A Seismic Upgrade for the Tenzing School in Santa Monica

Location

Santa Monica, CA

Size

1,000 SF

Project Status

Complete: 2022

Construction Value

$130,385

Scope of Work

General Contractor

Project Partners

LOC Architects

About

DD+B partnered with LOC Architects on a major upgrade to the rear paior of the Tenzing building at the Crossroads Chool for Arts & Sciences in Santa Monica, California. With students out on Spring Break, DD+B had a narrow window to complete the project. The existing rear outdoor space was demolished and replaced with a sloped-to-drain elevated concrete patio to provide space for students and faculty to gather for lunch. Additionally, DD+B installed an ADA ramp and stairs to meet existing requirements. All work was completed on time and in budget.

Key Project Details

Completed in record speed, on time and on budget

100% self-performed by DD+B expert craftsmen

Installed ADA ramp and stairs

Demolished existing rear space and replaced it with a sloped to drain elevated concrete patio