Location
Size
41-acre campus with 3 standalone buildings, each approx. 140,000 SF.
Project Status
Line 1 completed in 2021
Construction Value
$5,401,906 (Line 1 construction-only value; $15M in equipment purchased directly by owner)
Scope of Work
General Contractor
Project Partners
DrinkPAK, Flow Dynamics, Krones, Catherine McKenna Architects, Saphirre Engineering
About
DrinkPAK is the premier West Coast contract manufacturer of premium alcoholic and non-alcoholic beverages. As the most technologically advanced canned beverage facility in North America, DrinkPAK’s 24/7 operation can produce 2.1 billion cans annually. DrinkPAK engaged DD+B as the General Contractor to construct Line 1 of its new facility. This complex project required close collaboration between DD+B and DrinkPAK to create a functional, innovative facility that provides necessary space for the fast-growing company. From the start of slab demolition to the first produced can of sellable product, DD+B worked tirelessly around the clock to deliver an operational facility in just four months.